Construction Schedule
At Scenicridge, our commitment is to maintain your project within schedule and budget constraints. Below is an outline illustrating what our construction schedule typically entails.
Phase One: Startup
- Sign construction agreement
- Client provides deposit
- Confirm financing (if applicable)
- Course of construction insurance
- Open utility accounts
- Site meeting to confirm location
- Plans, surveying, and engineering
- Building permit acquisition
- Warranty registration
Phase Two: Foundation
- Clearing and excavation
- Blasting and site services
- Foundation details and forms
- Concrete footings, walls, and retaining wall material
- Floor slab material and finish
- Drainage and damp proofing
- Sand, gravel, and drain rock
- Concrete equipment and rentals
- Driveway, porch, patio, sidewalks, etc.
- Miscellaneous foundation work
Phase Three: Framing
- Framing materials and roof trusses
- Frame carpentry and structural requirements
- Barge and fascia boards
- Timber, posts, and beams
- Roofing material installation
Phase Four: Lockup
- Installation of windows and sliding glass doors
- Interior and exterior door hardware
- Overhead garage doors
- Plumbing rough-in and appliance specifications
- Water, storm, and sewer installations
- Plumbing fixtures: showers, tubs, valves, toilets, sinks, and faucets
Phase Five: Mechanical
- Installation of heating systems and ventilation
- Fireplaces
- Electrical wiring and layout
- Lighting fixtures
- Vacuum piping installation
Phase Six: Exterior Finish
- Siding installation
- Exterior siding and finish carpentry
- Exterior trim material and colors
- Gutters, downpipes, and soffits
- Masonry work
- Exterior painting
Phase Seven: Insulation and Drywall
- Insulation installation
- Drywall for walls and ceilings
Phase Eight: Interior Finishing
- Interior painting of walls, doors, and woodwork
- Installation of interior doors
- Interior door and window casings, baseboards, and finish carpentry
- Closet installation
- Floor coverings and floor tile
- Tile work for showers, tubs, and fireplace surrounds
- Cabinets, countertops, and other interior finishes
- Cleaning, cleanup, waste disposal
- Landscaping and fencing
Phase Nine: Completion
- Extras and owner’s manual preparation
This schedule provides a comprehensive overview of the construction process, ensuring your project stays on track and within budget.